Rail joints on all types of pavements
RAIL JOINT
Preparation of supports
Cleaning of the surfaces receiving the joints and preparation of the rail with a brushing machine and a blower.
Substrate pretreatment and application of the primer
After checking the cleanliness of the walls and the reservation of the joint, implementation of the hanging primer.
Implementation of the resin
After setting the casting machines, the resin is used in the reservation previously cleaned and prepared in accordance with the above instructions (interior & exterior). The resin must be homogenized and carefully mixed before use.
Verification
At the beginning of any work day, check that the joint casted the day before is free from defects.