Retexturing or surface water removing by grooving
Grooving in strips up to 1.50 ml wide on airstrip, airplane tracks or road infrastructure to increase grip and / or allow better drainage of runoff.
Grooving in strips up to 1.50 ml wide on airstrip, airplane tracks or road infrastructure to increase grip and / or allow better drainage of runoff.